• R&D Center @FGC UES, JSC
    RESEARCH AND DEVELOPMENT CENTER AT FEDERAL GRID COMPANY OF UNIFIED ENERGY SYSTEM, JOINT STOCK COMPANY
  • R&D Center @FGC UES, JSC
    RESEARCH AND DEVELOPMENT CENTER AT FEDERAL GRID COMPANY OF UNIFIED ENERGY SYSTEM, JOINT STOCK COMPANY
  • R&D Center @FGC UES, JSC
    RESEARCH AND DEVELOPMENT CENTER AT FEDERAL GRID COMPANY OF UNIFIED ENERGY SYSTEM, JOINT STOCK COMPANY
  • R&D Center for Power Engineering
    has one of the largest Russian testing center
  • R&D Center @FGC UES, JSC
    RESEARCH AND DEVELOPMENT CENTER AT FEDERAL GRID COMPANY OF UNIFIED ENERGY SYSTEM, JOINT STOCK COMPANY
  • R&D Center for Power Engineering
    unity of professionalism, long experience and scientific potential
  • R&D Center @FGC UES, JSC
    RESEARCH AND DEVELOPMENT CENTER AT FEDERAL GRID COMPANY OF UNIFIED ENERGY SYSTEM, JOINT STOCK COMPANY
  • R&D Center for Power Engineering
    unique offers in the sphere of power generation
Company news
15.07.11 The division head of the researches in the sphere of the superconductivity Victor Sytnikov (R&D Center for power engineering) made the appearance to the FGS UES management personnel
The second appearance under the formed plan of the monthly statements of the “R&D Center for power engineering” leading researches was held for the management personnel of the “FGS UES” JSC.
12.07.11 The representatives of “R&D Center for power engineering” JSC took part in the innovative projects expertise under the forum “Seliger-2011”
From July 6 till July 7, 2011 the specialists of “R&D Center for power engineering” took part in the R&D innovative projects expertise from the youth innovative center “System-Sarov” in the line of “energy efficiency and power saving” under the National youth forum “Seliger-2011”
04.07.11 Siemens LLC and “R&D Center for power engineering” signed the cooperation agreement
The opening ceremony of the plant “Siemens HV devices” LLC (Voronezh) was held the 1 June 2011.

28.04.11 RDCPE Experts Participate in the 6th International Science and Practice Seminar for Electric Power Energy
On April 18th – 23rd, 2011, RDCPE representatives took part in the International Science and Practice Seminar for Electric Power Energy “Important Aspects of Ensuring Reliability, Safety and Effectiveness in Energy System, Grid and Substation Equipment Operations” (IES-6). The seminar was organized by the Executive committee of the CIS Electric Energy Board in collaboration with St. Petersburg Training Institute for Electric Power. This was the 6th time the seminar, by now a widely popular event in the electric energy community, took place.
27.04.11 Concept Blueprint of Software & Hardwire Suite for the Digital Substation Completed and Submitted to FGC UES for Approval
Per agreement # И-11-41/10, the experts of RDCE in collaboration with Energosetproekt Institute and Continuum + LLC have developed a Concept blueprint of hardware and software suite for the digital substation of Federal Grid Company. The product was completed and submitted to FGC UES for review and approval.
Branch events
31.01.2019 FGC UES boosts the capacity of 220 kV Buzulukskaya substation feeding the west of the Orenburg Region by 1.5 times

FGC UES completed the reconstruction of 220 kV Buzulukskaya substation. The total cost of works amounted to RUB 650 million. As a result, the substation's capacity increased from 321.5 to 480 MVA. The project will result in more reliable power supply to Buzuluk city, the Orenburg Region, with a population of more than 85 thousand people, as well as to enterprises of the petroleum sector, in particular, Orenburgneft PJSC, a member of NK Rosneft.

30.01.2019 FGC UES will deliver 50 MW of capacity to the largest greenhouse complex in Mordovia

FGC UES completed the first step of the process connection of Teplichnoye agricultural complex, the only enterprise in Mordovia which grows vegetables under cover. The distribution of power supply of up to 15 MW to the consumer has been made possible. Completion of the second step of the project will allow to increase maximum power to 50 MW. This will allow the complex to build and modernize greenhouses with the total area of 15 hectares.

25.01.2019 FGC UES will allocate more than 2 billion RUB for repair of backbone electric grids of Siberia in 2019

Implementation of the maintenance and repair program will improve reliability of power supply to consumers throughout 9 regions of the Siberian Federal District, the Trans-Baikal Territory and the Republic of Buryatia located within the area of responsibility of MES of Siberia, a branch of FGC UES.

24.01.2019 FGC UES will deliver up to 153.6 MW of capacity to the largest greenhouse complex in the Moscow Region

FGC UES enabled a double increase – up to 153.6 MW – of the electric power supplied to  Agroculture Group greenhouse complex located in the Kashirsky District, Moscow Region. This will enable the complex to grow more vegetables and increase the yield up to 65 thousand tons per year.

23.01.2019 FGC UES launched its repair program of backbone electric grids of the Urals

1.24 billion RUB has been allocated for maintenance and repair of power facilities within the area of responsibility of MES of the Urals, a branch of FGC UES, in 2019. Implementation of the planned activities will allow to increase the reliability of power supply in seven regions of the Ural and Volga Federal Districts where more than 16 million people reside and large metallurgical, chemical and machine-building enterprises are located.

18.01.2019 In 2019, FGC UES will Clear Over 10 Thousand Hectares of Transmission Line Right-of-Way in the Far East

The work will be carried outs as part of the program for maintenance and repair of backbone power grids in the Far East. A set of measures for upgrading equipment of substations and backbone power lines has also been scheduled. The funding of the repair campaign in 2019 will total RUB 1.5 bln.

Our projects
Address: 115201, Moscow, Kashirsky highway, 22, 3
Tel: (495) 727-19-09
Developed by

magic design lab