• R&D Center @FGC UES, JSC
    RESEARCH AND DEVELOPMENT CENTER AT FEDERAL GRID COMPANY OF UNIFIED ENERGY SYSTEM, JOINT STOCK COMPANY
  • R&D Center @FGC UES, JSC
    RESEARCH AND DEVELOPMENT CENTER AT FEDERAL GRID COMPANY OF UNIFIED ENERGY SYSTEM, JOINT STOCK COMPANY
  • R&D Center @FGC UES, JSC
    RESEARCH AND DEVELOPMENT CENTER AT FEDERAL GRID COMPANY OF UNIFIED ENERGY SYSTEM, JOINT STOCK COMPANY
  • R&D Center for Power Engineering
    has one of the largest Russian testing center
  • R&D Center @FGC UES, JSC
    RESEARCH AND DEVELOPMENT CENTER AT FEDERAL GRID COMPANY OF UNIFIED ENERGY SYSTEM, JOINT STOCK COMPANY
  • R&D Center for Power Engineering
    unity of professionalism, long experience and scientific potential
  • R&D Center @FGC UES, JSC
    RESEARCH AND DEVELOPMENT CENTER AT FEDERAL GRID COMPANY OF UNIFIED ENERGY SYSTEM, JOINT STOCK COMPANY
  • R&D Center for Power Engineering
    unique offers in the sphere of power generation
Company news
15.07.11 The division head of the researches in the sphere of the superconductivity Victor Sytnikov (R&D Center for power engineering) made the appearance to the FGS UES management personnel
The second appearance under the formed plan of the monthly statements of the “R&D Center for power engineering” leading researches was held for the management personnel of the “FGS UES” JSC.
12.07.11 The representatives of “R&D Center for power engineering” JSC took part in the innovative projects expertise under the forum “Seliger-2011”
From July 6 till July 7, 2011 the specialists of “R&D Center for power engineering” took part in the R&D innovative projects expertise from the youth innovative center “System-Sarov” in the line of “energy efficiency and power saving” under the National youth forum “Seliger-2011”
04.07.11 Siemens LLC and “R&D Center for power engineering” signed the cooperation agreement
The opening ceremony of the plant “Siemens HV devices” LLC (Voronezh) was held the 1 June 2011.

28.04.11 RDCPE Experts Participate in the 6th International Science and Practice Seminar for Electric Power Energy
On April 18th – 23rd, 2011, RDCPE representatives took part in the International Science and Practice Seminar for Electric Power Energy “Important Aspects of Ensuring Reliability, Safety and Effectiveness in Energy System, Grid and Substation Equipment Operations” (IES-6). The seminar was organized by the Executive committee of the CIS Electric Energy Board in collaboration with St. Petersburg Training Institute for Electric Power. This was the 6th time the seminar, by now a widely popular event in the electric energy community, took place.
27.04.11 Concept Blueprint of Software & Hardwire Suite for the Digital Substation Completed and Submitted to FGC UES for Approval
Per agreement # И-11-41/10, the experts of RDCE in collaboration with Energosetproekt Institute and Continuum + LLC have developed a Concept blueprint of hardware and software suite for the digital substation of Federal Grid Company. The product was completed and submitted to FGC UES for review and approval.
Branch events
03.04.2019 Almost 760 FGC UES facilities join "Earth Hour"

FGC UES for the sixth time joined the Earth Hour, a global environmental event targeted at reminding about the reasonable consumption of resources. For 60 minutes, the lighting of 758 administrative buildings and substations was switched off in an amount that did not affect production activities and safety.

02.04.2019 FGC UES increases capacity of its Petersburg Energy Ring unit, 330 kV Vostochnaya substation, to 1850 MVA

FGC UES has replaced two 25 MVA transformers at 330 kV Vostochnaya substation for power equipment with total capacity of 80 MVA. The project has created opportunities to connect new consumers of the Vsevolozhsky district of the Leningrad Region with a population of more than 350 thousand people.

01.04.2019 FGC UES invests about 6 bn rubles into the upgrade of one of the key power hubs of the Western Siberia

The reconstruction of the 500 kV substation Tyumen has been completed. Power equipment with a total capacity of 1252 MVA has been completely upgraded at the facility, switching devices have been upgraded, and remote control systems have been installed. As a result, conditions have been created for connection of new consumers, improving the reliability of operation of the power facility participating in the scheme of power supply of Tyumenskaya CHP-1 and Tyumenskaya CHP-2, transit of power "Tyumen – Ural", and providing power supply to oil and gas and metallurgical enterprises.

29.03.2019 FGC UES connects R&D centers of Russia's biggest companies to the Skolkovo smart network

FGC UES has provided power supply for new facilities of the Skolkovo innovation center, including buildings of R&D units of SIBUR, Transmachholding, and Tatneft. The works have been made as part of the Skolkovo project to build a 20/04 kV smart distribution network with a total cost of RUB 10.3 billion.

18.03.2019 Federal Grid Company Announces FY 2018 IFRS Results

Federal Grid Company of Unified Energy System (“Federal Grid Company” or “the Company”; Moscow Exchange, LSE: FEES), part of PJSC ROSSETI Group of Companies, and the operator of the Unified National Electricity Grid (“UNEG”), announces its audited consolidated financial results for the year ended 31 December 2018 under International Financial Reporting Standards (IFRS).

15.03.2019 Notice of IFRS disclosure terms for the year ended 31 December 2018 and details of the conference call

Federal Grid Company of Unified Energy System , the operator of Russia’s unified electricity transmission grid system, will announce its audited consolidated IFRS financial results for the year ended 31 December 2018 on Monday, March 18, 2019.

Our projects
Address: 115201, Moscow, Kashirsky highway, 22, 3
Tel: (495) 727-19-09
Developed by

magic design lab