• R&D Center @FGC UES, JSC
    RESEARCH AND DEVELOPMENT CENTER AT FEDERAL GRID COMPANY OF UNIFIED ENERGY SYSTEM, JOINT STOCK COMPANY
  • R&D Center @FGC UES, JSC
    RESEARCH AND DEVELOPMENT CENTER AT FEDERAL GRID COMPANY OF UNIFIED ENERGY SYSTEM, JOINT STOCK COMPANY
  • R&D Center @FGC UES, JSC
    RESEARCH AND DEVELOPMENT CENTER AT FEDERAL GRID COMPANY OF UNIFIED ENERGY SYSTEM, JOINT STOCK COMPANY
  • R&D Center for Power Engineering
    has one of the largest Russian testing center
  • R&D Center @FGC UES, JSC
    RESEARCH AND DEVELOPMENT CENTER AT FEDERAL GRID COMPANY OF UNIFIED ENERGY SYSTEM, JOINT STOCK COMPANY
  • R&D Center for Power Engineering
    unity of professionalism, long experience and scientific potential
  • R&D Center @FGC UES, JSC
    RESEARCH AND DEVELOPMENT CENTER AT FEDERAL GRID COMPANY OF UNIFIED ENERGY SYSTEM, JOINT STOCK COMPANY
  • R&D Center for Power Engineering
    unique offers in the sphere of power generation
Company news
15.07.11 The division head of the researches in the sphere of the superconductivity Victor Sytnikov (R&D Center for power engineering) made the appearance to the FGS UES management personnel
The second appearance under the formed plan of the monthly statements of the “R&D Center for power engineering” leading researches was held for the management personnel of the “FGS UES” JSC.
12.07.11 The representatives of “R&D Center for power engineering” JSC took part in the innovative projects expertise under the forum “Seliger-2011”
From July 6 till July 7, 2011 the specialists of “R&D Center for power engineering” took part in the R&D innovative projects expertise from the youth innovative center “System-Sarov” in the line of “energy efficiency and power saving” under the National youth forum “Seliger-2011”
04.07.11 Siemens LLC and “R&D Center for power engineering” signed the cooperation agreement
The opening ceremony of the plant “Siemens HV devices” LLC (Voronezh) was held the 1 June 2011.

28.04.11 RDCPE Experts Participate in the 6th International Science and Practice Seminar for Electric Power Energy
On April 18th – 23rd, 2011, RDCPE representatives took part in the International Science and Practice Seminar for Electric Power Energy “Important Aspects of Ensuring Reliability, Safety and Effectiveness in Energy System, Grid and Substation Equipment Operations” (IES-6). The seminar was organized by the Executive committee of the CIS Electric Energy Board in collaboration with St. Petersburg Training Institute for Electric Power. This was the 6th time the seminar, by now a widely popular event in the electric energy community, took place.
27.04.11 Concept Blueprint of Software & Hardwire Suite for the Digital Substation Completed and Submitted to FGC UES for Approval
Per agreement # И-11-41/10, the experts of RDCE in collaboration with Energosetproekt Institute and Continuum + LLC have developed a Concept blueprint of hardware and software suite for the digital substation of Federal Grid Company. The product was completed and submitted to FGC UES for review and approval.
Branch events
28.11.2017 FGC UES R&D center tested a digital substation cybersecurity package

Preliminary testing of a pilot software-and-hardware package intended for ensuring cybersecurity of digital substations was carried out. The activities with participation of PJSC Rosseti, PJSC FGC UES and related entities took place at a special test site of the company’s research and development center (FGC UES R&D Center).

22.11.2017 FGC UES provided additional capacity to the group of oil fields in the southern Tyumen region

FGC UES (member of Rosseti Group) provided 126 MW of additional capacity for the external power supply of the Uvat group of fields in the Tyumen region. The work was performed under the agreement of utility connection of RN-Uvatneftegaz power grid facilities to the Unified National Power Grid.

20.11.2017 Federal Grid Company announces 9 months of 2017 IFRS results

Federal Grid Company of Unified Energy System (“Federal Grid Company” or “the Company”; Moscow Exchange, LSE: FEES), part of PJSC ROSSETI Group of Companies, and the operator of the Unified National Electricity Grid (“UNEG”), announces its unaudited interim condensed consolidated financial results for the three and nine months ended 30 September 2017, under International Financial Reporting Standards (IFRS).

17.11.2017 FGC UES installed its first Russian-made 500 kV oil/SF6 bushings at its substation

FGC UES (member of Rosseti Group) has commenced work to replace foreign bushings of 500 kV/220 kV autotransformers with Russian analogs at substations in the Moscow region. The first 500 kV oil/SF6 bushing manufactured by Moscow plant Izolyator on an order of FGC UES was installed at 500 kV substation Zapadnaya. No such equipment has ever been made in Russia before.

03.11.2017 FGC UES built a new 500 kV half-kilometer long OHL special crossing across the river Seversky Donets from Rostov NPP

FGC UES (member of Rosseti Group) has completed the construction of 500 kV “Rostov NPP – Shakhty” overhead line crossing across the navigable river Seversky Donets in the Rostov region. This will exclude intersection with the other unfinished new 500 kV OHL from the nuclear power plant to Rostov substation.

30.10.2017 VEB and RNC CIGRE association agree on proactive search for projects in branches of energy infrastructure

Vnesheconombank and Association “Russian National Committee of the International Council on Large Electric Systems” (RNC CIGRE Association) entered into a cooperation agreement.

Our projects
Address: 115201, Moscow, Kashirsky highway, 22, 3
Tel: (495) 727-19-09
Developed by

magic design lab