• R&D Center @FGC UES, JSC
    RESEARCH AND DEVELOPMENT CENTER AT FEDERAL GRID COMPANY OF UNIFIED ENERGY SYSTEM, JOINT STOCK COMPANY
  • R&D Center @FGC UES, JSC
    RESEARCH AND DEVELOPMENT CENTER AT FEDERAL GRID COMPANY OF UNIFIED ENERGY SYSTEM, JOINT STOCK COMPANY
  • R&D Center @FGC UES, JSC
    RESEARCH AND DEVELOPMENT CENTER AT FEDERAL GRID COMPANY OF UNIFIED ENERGY SYSTEM, JOINT STOCK COMPANY
  • R&D Center for Power Engineering
    has one of the largest Russian testing center
  • R&D Center @FGC UES, JSC
    RESEARCH AND DEVELOPMENT CENTER AT FEDERAL GRID COMPANY OF UNIFIED ENERGY SYSTEM, JOINT STOCK COMPANY
  • R&D Center for Power Engineering
    unity of professionalism, long experience and scientific potential
  • R&D Center @FGC UES, JSC
    RESEARCH AND DEVELOPMENT CENTER AT FEDERAL GRID COMPANY OF UNIFIED ENERGY SYSTEM, JOINT STOCK COMPANY
  • R&D Center for Power Engineering
    unique offers in the sphere of power generation
engMedia CenterСобытия отрасли
Media Center
Company news
15.07.11 The division head of the researches in the sphere of the superconductivity Victor Sytnikov (R&D Center for power engineering) made the appearance to the FGS UES management personnel
The second appearance under the formed plan of the monthly statements of the “R&D Center for power engineering” leading researches was held for the management personnel of the “FGS UES” JSC.
12.07.11 The representatives of “R&D Center for power engineering” JSC took part in the innovative projects expertise under the forum “Seliger-2011”
From July 6 till July 7, 2011 the specialists of “R&D Center for power engineering” took part in the R&D innovative projects expertise from the youth innovative center “System-Sarov” in the line of “energy efficiency and power saving” under the National youth forum “Seliger-2011”
04.07.11 Siemens LLC and “R&D Center for power engineering” signed the cooperation agreement
The opening ceremony of the plant “Siemens HV devices” LLC (Voronezh) was held the 1 June 2011.

События отрасли

05.10.2018 FGC UES completes preparation of UNEG facilities for upcoming HDP

FGC UES has finalized the main preparatory works for the seasonal peak load. Accident rate at the company’s facilities is down by 17%, according to preliminary results for the full year. This and other issues were discussed at the All-Russian Session On the Progress of Preparation of Electricity Industry Entities for the Upcoming Heat Deficit Period 2018/19 under the direction of Russia’s Energy Minister Alexander Novak as part of the Russian Energy Week. The event was attended by FGC UES’s Management Board Chairman A. Murov.

04.10.2018 FGC UES, PJSC decides on early retirement of series 15 bonds

On October 3, 2018, FGC UES, PJSC decided on the early retirement of series 15 bonds.

02.10.2018 FGC UES to ensure 30 MW power delivery to Bryansk Engineering Works

FGC UES is finalizing the key phase of expansion of the 220 kV Mashzavod substation, one of Bryansk main substations. This will result in a doubling of the facility’s capacity. The project cost totals 252 mn rubles. Effects include higher reliability of power supply to Bryansk consumers, the opportunity of delivering 30 MW worth of electric capacity to Bryansk Engineering Works (part of the Transmashholding Group), one of the largest diesel loco manufacturers.

25.09.2018 FGC UES among winners at the 15th International Professionalism Competitions Among the CIS Member States’ Electricity Industry Personnel

The FGC UES team which represented Russia at the International Competitions of at least 110 kV overhead lines repair and maintenance crews finished second. The individual event in the Best Electrician Category was won by the company’s electrician Danila Volodko. The tournament was held on September 16–21 in Brest. Participants in the competition also included companies from Belarus, Kazakhstan, Tajikistan, and Uzbekistan.

24.09.2018 FGC UES invests RUB 400 mln. to the modernization of the largest center of power supply to the Altai Territory

At 500 kV Barnaulskaya substation, the replacement of cross-connect equipment has been started. For the first time, 500 kV SF6 circuit breakers manufactured in Russia will be installed in the Siberian Federal District. This will increase the reliability and efficiency of the power facility which ensures power supply to the consumers of Altai Territory, Novosibirsk Region and Kemerovo Region and is involved in the international transit to the Republic of Kazakhstan.

20.09.2018 FGC UES has become the first electric power company in the Russian Federation, which has confirmed that its internal audit corresponds to the international standards

FGC UES has passed external independent assessment of the quality of its internal audit. According to Ernst & Young, the system applied by the company corresponds to the international professional standards and code of ethics of the Institute of Internal Auditors.

1 | 2 | 3 | 4 | Все

Our projects
Address: 115201, Moscow, Kashirsky highway, 22, 3
Tel: (495) 727-19-09
Developed by

magic design lab